Standard Merced ConcreteStandard Merced Concrete

Concrete Patio Construction in Merced CA - a patio with real grip when it's wet

Cracked, sinking or uneven slab out back? We pour a new patio with planned joints and a finish that grips underfoot.

Decorative stone patio with a circular fire pit and white chairs sits below a landscaped retaining wall.
  • Licensed and insured.
  • Free in-person estimates.
  • We reply within 1 business day.

What does it take to build a concrete patio in Merced?

Concrete patio construction in Merced is flatwork, the flat slabs like patios and driveways. We form, pour and finish a new slab so you get a level outdoor floor with a finish that suits how you'll use it. Most of the work happens on one pour day, and then the concrete needs time to cure before the furniture goes back out.

Most calls start with an old patio that's cracked into pieces, sunk at one side or flaking on top, or with a bare patch of dirt where you want a table and some shade. The price mostly moves with the size, the finish you pick, how much old concrete has to be broken out and how easy it is to get the concrete into your backyard. The schedule turns on how much digging and ground prep the spot needs and on the cure time after the pour, and your estimate puts your own figure in writing, with what's included and what isn't.

How can you tell your old patio needs replacing?

  1. Cracks that keep opening

    You see cracks that get wider each year, or the two sides of a crack no longer sit at the same height. That usually means the ground underneath has moved, and waiting lets water and weeds work in until pieces break loose and start tripping people.

  2. One side sinking or tilting

    A corner has dropped, or a puddle now sits in a low spot instead of running off. Usually the dirt under that edge settled or was never packed, and the longer it sinks, the more of the slab cracks along with it.

  3. Flaking, dusty or chipped top

    The surface sheds powder when you sweep it or chips off in thin flakes. That's often a top layer that was poured in the heat or worked too hard during finishing, and it keeps wearing away, so patches rarely hold.

Newly poured concrete patio slab beside a house, with control joints and two window wells.

How we build a concrete patio

We break out the old slab or strip the sod, dig down to firm ground and pack the subgrade, the soil the patio sits on, so the slab doesn't settle later with loose dirt under it. Then we set the forms, pour, finish the top and cut control joints, straight grooves that give the slab a planned line to crack along, and I show you where they'll go before the pour so you know how we're planning for cracks. After that comes curing, which means keeping the new concrete damp or covered so it hardens slowly and comes out strong instead of drying out weak. Most of the choice on your end is the finish, and if the patio gets wet, I'll steer you toward one with grip. If the budget gets tight, I'd rather you go plainer on the finish than skimp on the ground, because nobody can fix the ground once it's poured over.

A patio often ties into other work. If you want a pattern or color pressed into the surface, stamped concrete is done on the same pour, and if you need a path from the driveway or the back door, we can pour a concrete sidewalk with it so the two meet flush.

  • Broom finish

    A broom finish, fine lines dragged across the wet surface, suits patios that get wet from a hose, sprinklers or a pool. It's the one I recommend most often, because it gives shoes something to hold.

  • Exposed aggregate

    This suits people who want texture and color from the stone itself, since we wash back the top layer to show the gravel in the mix. It grips well and hides dirt, but it takes more labor than broom.

  • Stamped or colored

    This suits a patio that's mostly for looks, like a dining spot under a cover, where it won't see much water. It costs more than broom, and a sealed stamped surface can be slicker when it's wet.

Get a written estimate for your new patio

We reply within one business day to set a time. I come out, look at the spot and give you a free written estimate with what's included, and there's no pressure to book.

(209) 308-1029
Based in
Merced, CA 95340
Hours
Mon–Sun: 8 AM–9 PM

What happens after you call about a patio?

Here's how a patio job runs, from your first call to the day you can set the table back out.

  1. Call or send the form

    You call (209) 308-1029 or send the form, and we set a time for me to come out. We'll ask roughly how big a patio you have in mind and whether old concrete has to come out.

  2. I look at the job

    I come out myself, walk the spot and ask how you plan to use the patio. You get the estimate in writing, so you can see what's covered before you decide anything.

  3. We settle the pour plan

    Before any forms go in, we go over the plan with you, including the finish and where the joints will sit. That way you know what the crew will do on pour day.

  4. Pour, finish and cure

    On pour day we work quickly, finish clean and leave the site tidy. Then we look after the new concrete while it cures and tell you when it's ready to use.

Why Merced homeowners call Standard Merced Concrete for patios

  • The owner looks at every job

    I come out to see the job myself, and our crew does the work with me running it on site. The person who planned your patio is the one standing there when it's poured.

  • Licensed and insured

    We're licensed and insured, and I'm glad to show you both at the estimate. Asking for them is the quickest way to tell a real contractor from someone with a truck and a mixer.

  • Running Merced jobs since 2023

    I started this business in 2023 after working summers on concrete crews all through school, so I could run jobs the way I was taught. That means the ground, the joints and the curing get the time they need, even when rushing would be cheaper.

On a patio, the ground and the joints matter more than anything you'll see on top. Tell us about your patio or call (209) 308-1029, and I'll set a time to come out.

Patios, walkways and slabs on Merced soil

One soil data summary gives Merced County's main soils a moderate shrink-swell rating, which means the ground shrinks during long dry spells and swells back when the wet season comes. Under a patio, that movement can pull support away from the edges first. So I look closely at the edges when I come out, and we talk through how we'll handle them before anything gets formed.

We're based in Merced and work across the cities around it, and we get the same backyard calls in Atwater and Turlock, mostly older patios that cracked or dropped at the edges and bare yards waiting for their first slab.

Questions about concrete patios in Merced

How much does a new concrete patio cost in Merced?

The cost comes down to the patio's size, how much old concrete or dirt has to come out first, the finish you choose and how hard it is to get the concrete to the spot. A broom finish is usually the least expensive, while exposed aggregate and stamped work add labor. Your written estimate lists what's included so you can compare it with other bids.

Will my new concrete patio crack?

Some cracking is normal, because concrete can't be kept from cracking entirely, but well-planned joints control where it cracks and keep it to a minimum. Wire mesh won't stop cracks either, though it tends to keep them from opening up. Whoever you hire, ask at the estimate how they'll lay out the joints.

What is the best patio finish for grip when it's wet?

A broom finish is usually the practical pick for grip, while a smooth troweled finish can be too slick on a wet outdoor surface. Sealed or color-enhanced finishes can look polished, but they can change traction and upkeep. If you'll be walking on the patio wet, put grip ahead of a cleaner look.

How long does a concrete patio last?

One contractor's guide says broom, exposed aggregate and stamped finishes can all last for decades on well-prepared ground. The same guide says the prep and the joints matter far more than the finish, so compare what each estimate says about them. It also says stamped and exposed aggregate do better with a fresh coat of sealer, typically every couple of years.

Who can legally build a concrete patio in California?

California requires a license from the Contractors State License Board in some cases, including when the job uses any hired workers or costs $1,000 or more in labor and materials. That covers any patio where a contractor brings a crew. Ask for the license before you sign anything.

How long does a new concrete patio need to cure?

In hot weather, industry guidance says curing should start as soon as finishing is done and keep going for at least three days. Crews cover the slab with wet burlap and plastic, coat it with a curing compound or keep it wet with water. The same guidance says to pour and finish outside the hottest part of the day when possible, which can set the start time on pour day.

  • Stamped concrete services

    When you want the patio to look like stone, brick or tile, stamping presses a pattern and color into the same pour while it's still workable.

  • Concrete sidewalk building

    A new patio often needs a walkway from the driveway or back door, and pouring both together keeps the finish and the height matched where they meet.

Service areas for patio work around Merced

Standard Merced Concrete is based in Merced, California, and builds patios across the cities around it. The 12 areas listed here include Livingston and Winton, and we work in other cities nearby too.

Merced, CA

Book a patio estimate in Merced

Send a few photos of the spot and the rough size you want with your request, so I can plan the visit around what you have in mind.